Client
Location
Eccles, Greater Manchester
Sector
Utilities - Groundworks
Project Date
August 2023
Description
Cummins Civil Engineering provided a groundworks and drainage project at Eccles Bus Depot, Greater Manchester. This included installing shuttering for a new concrete hard standing, brush finish concreting, constructing a concrete ramp for bus access to the higher level and tarmacked areas along the fence line for storage and bus parking. Additionally, drains were installed outside the bus depot building to ensure effective drainage solutions.
Comments